Super Specialty Hospital, BHU Varanasi – 1450 TR Chiller Installation Image 1 Super Specialty Hospital, BHU Varanasi – 1450 TR Chiller Installation Image 2 Super Specialty Hospital, BHU Varanasi – 1450 TR Chiller Installation Image 3

Super Specialty Hospital, BHU Varanasi – 1450 TR Chiller Installation

The Super Specialty Hospital at Banaras Hindu University (BHU), Varanasi, is a premier healthcare facility delivering advanced multi-specialty care. To support its large-scale operations, the hospital required a high-capacity, energy-efficient chilled water system to maintain precise temperature and humidity control across patient wards, ICUs, operation theaters, diagnostic labs, and administrative areas.

Our team successfully executed the installation of a 1450 TR centralized chiller plant, featuring:

  • Water-cooled screw chillers designed for optimal efficiency and reliability
  • Primary and secondary chilled water pumping systems
  • High-capacity air handling units (AHUs) and fan coil units (FCUs) for precise air distribution
  • Integration with Building Management System (BMS) for real-time monitoring and energy optimization
  • Acoustic treatment and vibration isolation to ensure patient comfort

Challenges & Solutions

The installation required working within an operational hospital environment. To minimize disruption:

  • A phased execution strategy was implemented
  • Critical areas maintained continuous cooling
  • Safety, hygiene, and compliance with medical standards were strictly followed

Achievement

The 1450 TR chiller installation at BHU’s Super Specialty Hospital represents a major benchmark in healthcare HVAC infrastructure, providing reliable, energy-efficient, and intelligent climate control for a complex multi-specialty facility.

“The Super Specialty Hospital at Banaras Hindu University (BHU), Varanasi, is a premier healthcare facility delivering advanced multi-specialty care. To support its large-scale operations, the hospital”

UniTech